The reason we standardize on Ubiquiti is that it lets access control, cameras, network and AV share one management layer. One login, one set of users, one place to see what the building is doing.
Request a site walkScope of work
Every smart building automation project is designed for the specific building, so the list below is the scope we plan and price before work begins.
Most commercial buildings accumulate systems the way a house accumulates remotes: one for cameras, one for doors, one for phones, one for the conference room. Standardizing on one platform means one login, one user list, and one place to see what the building is doing.
On a unified UniFi deployment, a person who joins the company gets one account that reaches the doors they need, the network they use and the footage they are allowed to see. When they leave, one action removes all of it.
That matters operationally. It means no spreadsheet of who has which login, no vendor call to change a permission, and no gaps where a departed employee still has camera access.
Because the systems share a platform, they can react to each other: a door forced open after hours triggers a camera clip and a notification, a scheduled unlock follows the building calendar, a camera detects a person in a restricted area and the event lands in the same log as the door record.
Lighting, AV and access schedules can follow occupancy rather than a fixed timer, which is where the energy and nuisance-alarm savings come from.
Almost no one replaces everything at once, and no one should. The usual path is network first, then cameras, then doors and phones, reusing existing cabling and hardware where it is sound and keeping legacy systems where replacement is not justified yet.
Each phase leaves the building working, documented and remotely supportable, so the decision to continue is a business one rather than an emergency.
In practice it means the systems talk to each other: a door held open triggers a camera clip, a badge event unlocks the right floor, and one dashboard shows all of it.
No. We phase the work. Existing systems stay in place until they are replaced, and the new layer is designed to absorb them.
We do, with documented configuration, credentials handed to you, and remote support on the same platform.
A site walk costs nothing and usually finds the real problem. We will tell you what we would do, what it costs, and what can wait.